The Pakistan Telecommunication Authority (PTA) has proposed a phased shift of telecom towers to alternative energy sources, including solar power, battery storage and hybrid systems, to reduce diesel consumption, tackle frequent power outages and improve network reliability.
The regulator has invited telecom operators and infrastructure providers to submit time-bound plans for converting Base Transceiver Stations (BTS) to alternative energy. Operators have been asked to identify sites experiencing prolonged outages, assess the feasibility of renewable energy solutions and propose investment plans with implementation timelines of one, two or three years. PTA has also sought industry feedback by December 7, 2026, on whether solar installations should be mandatory at sites experiencing monthly outages of 5% or more.
The proposed roadmap also calls for reducing diesel consumption at the 10% highest diesel-consuming BTS sites. Operators would provide details of existing energy use, backup arrangements, grid availability and proposed reductions. PTA has stressed that alternative energy systems must ensure uninterrupted connectivity during nighttime, cloudy weather and other periods of limited solar generation.
The authority is also considering incentives for energy-efficient operators, shared renewable-energy infrastructure and coordination with power-sector institutions. It has invited telecom companies, tower operators, energy providers and other stakeholders to submit their recommendations before the deadline.


















